What we have here, folks, is an amazing transformation. Our house is /was a 3 bedroom, 1.5 bathroom ranch. The basement runs the full footprint of the entire house and was partially finished, long ago. After performing about 2 weeks of demolition and several trips to the dump, I decided that if I wanted any quality of life over the next 2 years I would need a contractor.
The layout we designed would give us another bedroom, another full bathroom, a laundry room, a workout room, a storage room, a room for future oil tank housing, a workshop, and a great, great room.
Pictures here are before, during, and after.
Bathroom - travertine tile.
I did leave myself one finishing touch project - an overhead rolling pocket door separating the workshop from the rest of the basement. Picture below shows where it will go...
... and I've finally got my workshop back, and better than ever after a few days of organization and building new work surfaces.